|
2009 Site M63 - Manitou River During Construction |
|
|
|
|
Site M63 had several improvements made to it including some pools pounded out in the limestone bedrock, a cattle watering ramp to prevent further contamination and erosion and bank stabilization on the bend in the river.
Back to Photo Archive
|